The project represents a wind farm with a total capacity of 120 MW and a shared annual output of 326 million kW•h, consisting of two separate wind power plants: in the locality of Burmaki with a capacity of 49.5 MW (annual output 132 million kW•h); and a wind farm in the locality of Luzhishche with a capacity of 79.2 MW (annual output 194 million kW•h). This project provides for the use of wind energy to generate electrical energy. Pre-project preparation is in progress.
Sector:
Energy
Country:
Republic of Belarus
Project developer :
RUE State Production Association Belorusneft
Contacts:
E-mail: a.nikitenko2@beloil.by
Tel.: +375 (232) 79 34 11
Back to the list